Meetings / Trial Nominations
Auckland RC @ Ellerslie Last updated
Tuesday, 16 Jun 2020
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
TBA -
Weather
TBA -
Rail
True -
Track
Right hand
1876m -
Straight
382 Metres